|
| |

Construction Site - Rejuvenation of Wasteland |

Assembly of the Matrix Wick Drain |

Photo Shows 15 L/M Wick Drain |

Placement of Wick into Steel Piling |

Boring of Wick Drains |

Backfill of Wick with Lime and Sand |

Leach Matrix to Feed Wick Drains |

Project Site Plan |
|