|
Preparation of Drainage Network |
|
Excavation of Rainwater/Detention System |
|
Leveling of the Base |
|
Stormwater Distribution Pit |
|
Preparing Excavation for Matrix Cells |
|
Leveling Base with Coarse River Sand |
|
Photo Shows Levels of Inflow and Outlet |
|
Pipe Work Set into Matrix Cell |
|
Standpipes for Irrigation Pick Up |
|
Overview of Robina Riverwalk |