|
| |
 
Compacted sand base above EVA Membrane with Turf Cells Placed |
 
Additional Turf Cell being added |

Filling the Turf Cell with organic loam mixture |
 
Pictures illustrate Turf Cell back filled ready for Turf on top |
 
Turf cell successfully installed with Turf laid over the top |
|