
Preparation of the excavation |

Sand layer in base of excavation |

Geotextile around the walls and base of the excavation |

Leveling the base |

Preparing Excavation for Flo Tank Modules |

Installation of the Atlantis Flo Tank Modules |

Backfill over the top layer of the tank |

Another layer of Geotextile |

A second layer of biaxial Geogrid material to aid under heavily
trafficable areas |

Finished surface level |