Excavation of Moura Parkland - Sand base laid |

Geotextile and EVA liner laid in excavation. |

Protective sand layer laid over EVA liner to protect both membrane and
cells |

Another layer of Geotextile is laid and the Matrix Modules are placed in
the excavation |

All the Modules are laid and inspection pipes are installed in the tank |

Backfilling of the tank occurs, and landscaping can begin |

The tank is now installed as a feature of the landscaped area |
 
 