|
| |

Excavation has been cut with first few layers of Geotextile and rows of
Flo Modules |
 
All Modules are positioned, wrapping of Geotextile to complete before
backfill of sand |

Inlet Pipes are connected |
 
Pictures displays dual inlet pipes connected with sand backfill up each
side |

Spreading the Sand to backfill to finished level |

Once backfill is at finished level, heavy water compaction is carried
out |
|