
Assembling the Matrix Cells |

Excavation |

Checking the Depth |

Checking Levels |

Extending Excavation |

Leveling Sand Layer |

Spreading Washed River Sand over System |

Picture Shows Black Lined Tank & White Textile Lined Infiltration System |

Reverse Angle of Picture Above
|
 
Drainage Cells Placed against Retaining Wall to effect Overflow Drainage
(BEFORE AND AFTER) |

Atlantis Filtration Unit with Concrete Riser to Maintain Correct Levels |

Garden Area after Completion |

Children's Play Area Set over Atlantis System |