Start of works

The Matrix Modules arrive flat packed on site - Requiring minimal contruction

The excavation is complete - The area is lined with Geotextile and a sand layer is installed to protect the tanking membrane

A geotextile layer is laid over the sand layer in the bottom of the excavation

Perspective of the excavation area

The tanking membrane was constructed to spec off site and installed in the bottom of the excavation area

Completing laying of the membrane - Enough membrane has been allocated to cover the sides of the Matrix Tank

A layer of sand is installed in the tank to protect the membrane and Matrix tanking cells

The Matrix Cells are installed in the excavation area

Perspective of the cell installation

Perspective of the cell installation #2

The tank is wrapped in Geotextile and inspection points installed

The tank is backfilled with sand to protect the tank and aid in bio filtration of surface water into the Modules

Landscape features over the top of the Matrix Tank. 347,000L of water tank exist under the grounds of the park

The final landscaping is finished and the surroundings are completed