Assembly of Atlantis Flo Tank Modules |
 
Start of the excavation |

Excavation cut, 100mm of compacted Coarse Washed River Sand for first
profile layer |

Geotextile laid covering excavation walls, EVA Membrane placed and then
positioned correctly |

100mm of compacted and leveled coarse washed river sand |

First row of Flo Tank Modules on Geotextile |

All Modules placed and concealed inside Geotextile with stand pipes
connected |

Ensuring that EVA Membrane is at adequate height on all sides,
additional Coarse washed river sand fills the profile between EVA
Membrane and outer Geotextile layer |
 
completing backfill of Coarse Washed River Sand to level height of the
Flo Tank System |

A Further 100mm of sand is to be compacted above System before backfill
of organic sandy loam profile to finished level |